1. House Foundation Upper Hutt
A. 10.30am footings poured,
polystyrene blocks arrive
B. 12.30pm Polystyrene blocks tied
and in place ready to take top steel rod with final concrete pour to
commence at approx. 2.15pm |


Top |
|
2. This house foundation completed in 3
working days.
Polystyrene under slab saves 25% heat loss
in combination with Insulform blocks |

Top |
|
3.
Timber formwork on this foundation took 2 men 2 weeks plus 3 days stripping.
Next time they used Insulform block and
saved 1.5 weeks |

Top |
|
4.
House foundation commenced at 6.30am using 4 caepenters and one truck only.
At 12.30 all retired having completed the
house foundation for alittle Upper Hutt hospitality. |

Top |
|
5.
Foundation blocks in place, poured, and ready for backfilling.
Khandallah, Wellington |

Top |
|
6.
Large house foundation
Takapau Rd. Tawa, Wellington |